1 |
59999446 |
SHYAMBIHARI YADAV K GHAR SE HANUMAN MANDIR K GADDHE TAK BHUMIGAT HUME PIPE NALI KA NIRMAN KARY |
900000 |
SHYAMBIHARI YADAV K GHAR SE HANUMAN MANDIR K GADDHE TAK BHUMIGAT HUME PIPE NALI KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.7577842,25.7577842
Longitude : 84.154033,84.154033
file name : Image_03022022154703848.png
|
2022-02-03 15:47:03.978383 |
2 |
59999726 |
JANARI ME SATYANARAYAN K GHAR K PASS, SAPHA ME JAGNARAYAN PANDEY K GHAR SE LINK ROAD TAK AUR PRATHMI |
600000 |
JANARI ME SATYANARAYAN K GHAR K PASS, SAPHA ME JAGNARAYAN PANDEY K GHAR SE LINK ROAD TAK AUR PRATHMI1 |
Completion of work |
-
latitude : 25.7577701,25.7577701
Longitude : 84.1540367,84.1540367
file name : Image_03022022154637317.png
|
2022-02-03 15:46:37.434077 |
3 |
44688253 |
PRATHMIK VIDYALAY SAPHA KA BOUNDRY WALL KARY |
2064000 |
PRATHMIK VIDYALAY SAPHA KA BOUNDRY WALL KARY1 |
Completion of work |
-
latitude : 25.75442574452609
Longitude : 84.2249957844615
file name : Image_05072021155839549.png
|
2021-07-05 15:58:39.783769 |
4 |
44914945 |
PRATHMIK VIDYALAYA CHAKIYA K BARI KA SUNDARIKARAN AUR PEVARS BLOCK KARY |
1500000 |
PRATHMIK VIDYALAYA CHAKIYA K BARI KA SUNDARIKARAN AUR PEVARS BLOCK KARY1 |
Completion of work |
-
latitude : 25.748515790328383,25.748471240513027
Longitude : 84.21579429879785,84.2158190254122
file name : Image_03072021131615318.png
|
2021-07-03 13:16:15.417052 |
5 |
44914945 |
PRATHMIK VIDYALAYA CHAKIYA K BARI KA SUNDARIKARAN AUR PEVARS BLOCK KARY |
1500000 |
PRATHMIK VIDYALAYA CHAKIYA K BARI KA SUNDARIKARAN AUR PEVARS BLOCK KARY1 |
Completion of work |
-
latitude : 25.748515790328383,25.748471240513027
Longitude : 84.21579429879785,84.2158190254122
file name : Image_03072021131653110.png
|
2021-07-03 13:16:53.310923 |
6 |
50275030 |
OPERATION KAYAKALP K ANTARGART PRATHMIK VIDHALAY CHAKIYA KA BARI JANARI DUBHAR ME BENCH LAGANE KA KA |
1000000 |
OPERATION KAYAKALP K ANTARGART PRATHMIK VIDHALAY CHAKIYA KA BARI JANARI DUBHAR ME BENCH LAGANE KA KA1 |
Completion of work |
-
latitude : 25.748393665999174,25.74851725716144
Longitude : 84.21578382141888,84.21598364599049
file name : Image_03072021131420842.png
|
2021-07-03 13:14:20.956468 |
7 |
50273217 |
OPERATION KAYAKALP K ANTARGART PRATHMIK VIDHALAY SAPHA JANARI DUBHAR ME BENCH LAGANE KA KARYA |
800020 |
OPERATION KAYAKALP K ANTARGART PRATHMIK VIDHALAY SAPHA JANARI DUBHAR ME BENCH LAGANE KA KARYA 1 |
Completion of work |
-
latitude : 25.754496487788856,25.75462473090738
Longitude : 84.22490894794464,84.22502914443612
file name : Image_05072021155810661.png
|
2021-07-05 15:58:10.808246 |
8 |
50273217 |
OPERATION KAYAKALP K ANTARGART PRATHMIK VIDHALAY SAPHA JANARI DUBHAR ME BENCH LAGANE KA KARYA |
800020 |
OPERATION KAYAKALP K ANTARGART PRATHMIK VIDHALAY SAPHA JANARI DUBHAR ME BENCH LAGANE KA KARYA 1 |
Completion of work |
-
latitude : 25.7545951846987,25.754579552449286
Longitude : 84.22483627684414,84.22480266541243
file name : Image_05072021155848624.png
|
2021-07-05 15:58:48.827861 |
9 |
55083484 |
AMRESH THAKUR K GHAR SE ARUN PANDEY K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY |
600000 |
AMRESH THAKUR K GHAR SE ARUN PANDEY K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.76362333333333,25.76362333333333
Longitude : 84.153735,84.153735
file name : Image_24102021202616886.png
|
2021-10-24 20:26:16.986789 |
10 |
55083509 |
SHIVSHANKAR K GHAR SE DHANJI YADAV K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY |
600000 |
SHIVSHANKAR K GHAR SE DHANJI YADAV K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.763838333333336,25.763838333333336
Longitude : 84.15382999999999,84.15382999999999
file name : Image_24102021202613896.png
|
2021-10-24 20:26:13.995535 |
11 |
55083562 |
HAKADU CHOUDHARI K GHAR SE KAMTA CHOUDHARI K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY |
750000 |
HAKADU CHOUDHARI K GHAR SE KAMTA CHOUDHARI K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.7636031,25.7636031,25.7636031
Longitude : 84.1519225,84.1519225,84.1519225
file name : Image_24102021202610890.png
|
2021-10-24 20:26:10.986868 |
12 |
55083587 |
RING BANDHE SE BADAK PANDEY K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY |
600000 |
RING BANDHE SE BADAK PANDEY K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.7636031,25.7636031
Longitude : 84.1519225,84.1519225
file name : Image_24102021202608133.png
|
2021-10-24 20:26:08.227086 |
13 |
54561983 |
OPERATION KAYAKALP K ANTARGAT PRATHMIK VIDYALAYA CHAKIYA K BARI ME SMART CLASS LAB KI STHAPNA KA KAR |
750000 |
OPERATION KAYAKALP K ANTARGAT PRATHMIK VIDYALAYA CHAKIYA K BARI ME SMART CLASS LAB KI STHAPNA KA KAR1 |
Completion of work |
-
latitude : 25.763193333333334,25.763193333333334
Longitude : 84.15324833333334,84.15324833333334
file name : Image_24102021192958213.png
|
2021-10-24 19:29:58.356761 |
14 |
52604633 |
OPERATION KAYAKALP K AANTARGAT COMPOSIT VIDYALAYA JANARI ME SMART CLASS LAB KI STHAPNA KA KARY |
750000 |
OPERATION KAYAKALP K AANTARGAT COMPOSIT VIDYALAYA JANARI ME SMART CLASS LAB KI STHAPNA KA KARY1 |
Completion of work |
-
latitude : 25.74996615294367,25.74996192008257
Longitude : 84.22316157259047,84.22307515516877
file name : Image_03072021131718919.png
|
2021-07-03 13:17:19.009672 |
15 |
52604651 |
OPERATION KAYAKALP K AANTARGAT PRATHMIK VIDYALAYA CHAKIYA K BARI JANARI ME SMART CLASS LAB KI STHAPN |
750000 |
OPERATION KAYAKALP K AANTARGAT PRATHMIK VIDYALAYA CHAKIYA K BARI JANARI ME SMART CLASS LAB KI STHAPN1 |
Completion of work |
-
latitude : 25.748433019034564,25.748381805606186
Longitude : 84.21582355163991,84.21590074896812
file name : Image_03072021131638275.png
|
2021-07-03 13:16:38.39165 |
16 |
52604651 |
OPERATION KAYAKALP K AANTARGAT PRATHMIK VIDYALAYA CHAKIYA K BARI JANARI ME SMART CLASS LAB KI STHAPN |
750000 |
OPERATION KAYAKALP K AANTARGAT PRATHMIK VIDYALAYA CHAKIYA K BARI JANARI ME SMART CLASS LAB KI STHAPN1 |
Completion of work |
-
latitude : 25.748433019034564,25.748381805606186
Longitude : 84.21582355163991,84.21590074896812
file name : Image_03072021131708416.png
|
2021-07-03 13:17:08.526432 |
17 |
52604667 |
OPERATION KAYAKALP K AANTARGAT PRATHMIK VIDYALAYA SAPHA JANARI ME SMART CLASS LAB KI STHAPNA KA KARY |
750000 |
OPERATION KAYAKALP K AANTARGAT PRATHMIK VIDYALAYA SAPHA JANARI ME SMART CLASS LAB KI STHAPNA KA KARY1 |
Completion of work |
-
latitude : 25.75457221828401,25.75454401317984
Longitude : 84.2248969618231,84.22496770508587
file name : Image_05072021191244021.png
|
2021-07-05 19:12:44.083885 |
18 |
52604667 |
OPERATION KAYAKALP K AANTARGAT PRATHMIK VIDYALAYA SAPHA JANARI ME SMART CLASS LAB KI STHAPNA KA KARY |
750000 |
OPERATION KAYAKALP K AANTARGAT PRATHMIK VIDYALAYA SAPHA JANARI ME SMART CLASS LAB KI STHAPNA KA KARY1 |
Completion of work |
-
latitude : 25.754369501955807,25.754417362622917
Longitude : 84.22505839727819,84.22503442503512
file name : Image_05072021191306184.png
|
2021-07-05 19:13:06.245854 |
19 |
45301690 |
PRATHMIK VIDYALAYA CHAKIYA K BARI ME VIDYALAYA KA PRAVESH DWAR AUR GATE NIRMAN KARY |
460000 |
PRATHMIK VIDYALAYA CHAKIYA K BARI ME VIDYALAYA KA PRAVESH DWAR AUR GATE NIRMAN KARY1 |
Completion of work |
-
latitude : 25.74843448586762
Longitude : 84.21607014723122
file name : Image_03072021131452438.png
|
2021-07-03 13:14:52.550554 |
20 |
45301699 |
PRATHMIK VIDYALAYA CHAKIYA K BARI JANARI KA SUNDARIKARAN AUR PEVARS BLOCK KARY |
1000000 |
PRATHMIK VIDYALAYA CHAKIYA K BARI JANARI KA SUNDARIKARAN AUR PEVARS BLOCK KARY1 |
Completion of work |
-
latitude : 25.748442448675632
Longitude : 84.21590820886195
file name : Image_03072021131504944.png
|
2021-07-03 13:15:05.041986 |
21 |
45301681 |
PRATHMIK VIDYALAYA CHAKIYA K BARI ME HAND PUMP REBOR AUR JALAPURTI KARY |
620000 |
PRATHMIK VIDYALAYA CHAKIYA K BARI ME HAND PUMP REBOR AUR JALAPURTI KARY1 |
Completion of work |
-
latitude : 25.748445256613195
Longitude : 84.21593377366662
file name : Image_03072021131551251.png
|
2021-07-03 13:15:51.330942 |
22 |
45301667 |
PRATHMIK VIDYALAYA SAPHA ME HAND PUMP REBOR AUR JALAPURTI KARY |
600500 |
PRATHMIK VIDYALAYA SAPHA ME HAND PUMP REBOR AUR JALAPURTI KARY1 |
Completion of work |
-
latitude : 25.75466865208
Longitude : 84.22490182332695
file name : Image_05072021155823725.png
|
2021-07-05 15:58:24.016653 |
23 |
41357527 |
DHIRAJ BRAHM K ASTHAN PAR KUDEDAN KA NIRMAN |
100000 |
DHIRAJ BRAHM K ASTHAN PAR KUDEDAN KA NIRMAN1 |
Completion of work |
-
latitude : 25.744335567578673
Longitude : 84.22210494987667
file name : Image_05072021191249479.png
|
2021-07-05 19:12:49.55096 |
24 |
41357655 |
DHIRAJ BRAHM K ASTHAN PAR SOKHTA KA NIRMAN |
50000 |
DHIRAJ BRAHM K ASTHAN PAR SOKHTA KA NIRMAN1 |
Completion of work |
-
latitude : 25.74443040881306
Longitude : 84.22211316414177
file name : Image_05072021191254930.png
|
2021-07-05 19:12:54.999147 |
25 |
41358113 |
DHIRAJ BRAHM K ASTHAN K PASS GANGA CHABUTRA KA NIRMAN KARYA |
200000 |
DHIRAJ BRAHM K ASTHAN K PASS GANGA CHABUTRA KA NIRMAN KARYA1 |
Completion of work |
-
latitude : 25.74439126532525
Longitude : 84.22198114916682
file name : Image_05072021191300872.png
|
2021-07-05 19:13:00.944805 |
26 |
52604516 |
COMPOSIT VIDYALAYA JANARI ME BACHHO KO BAITHANE HETU SCHOOL BRENCH LAGANE KA KARY |
1000000 |
COMPOSIT VIDYALAYA JANARI ME BACHHO KO BAITHANE HETU SCHOOL BRENCH LAGANE KA KARY1 |
Completion of work |
-
latitude : 25.749941216781735,25.749976211227477
Longitude : 84.2229166533798,84.22298161312938
file name : Image_05072021155745771.png
|
2021-07-05 15:57:46.031891 |
27 |
49106698 |
HAND PUMP MARAMAT KARY |
600000 |
HAND PUMP MARAMAT KARY1 |
Completion of work |
-
latitude : 25.7487256731838
Longitude : 84.21482870355248
file name : Image_27072021132802539.png
|
2021-07-27 13:28:02.630401 |
28 |
52604389 |
SOKHTA GADDHA NIRMAN KARY |
600000 |
SOKHTA GADDHA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.75495455879718,25.754935699515045
Longitude : 84.22599599696696,84.2259265948087
file name : Image_03082021193947279.png
|
2021-08-03 19:39:47.360255 |
29 |
54561998 |
GRAM PANCHAYAT JANARI ME VIBHINN STHANO PAR STREET LIGHT LAGANE KA KARY |
600000 |
GRAM PANCHAYAT JANARI ME VIBHINN STHANO PAR STREET LIGHT LAGANE KA KARY1 |
Completion of work |
-
latitude : 25.748026666666668,25.748004999999996
Longitude : 84.21262499999999,84.212615
file name : Image_27092021153508650.png
|
2021-09-27 15:35:08.982466 |
30 |
54562016 |
GRAM PANCHAYAT JANARI ME VIBHINN STHANO PAR DUSTBIN STHAPNA KA KARY |
600000 |
GRAM PANCHAYAT JANARI ME VIBHINN STHANO PAR DUSTBIN STHAPNA KA KARY1 |
Completion of work |
-
latitude : 25.748888333333337,25.748888333333337
Longitude : 84.21484833333334,84.21484833333334
file name : Image_27092021150134506.png
|
2021-09-27 15:01:34.592743 |
31 |
54561946 |
GRAM PANCHAYAT JANARI K ANTARGAT VIBHINN STHANO PAR 2 HIGH MAST LIGHT KA STHAPNA KA KARY |
600000 |
GRAM PANCHAYAT JANARI K ANTARGAT VIBHINN STHANO PAR 2 HIGH MAST LIGHT KA STHAPNA KA KARY1 |
Completion of work |
-
latitude : 25.74884833333333,25.74885
Longitude : 84.21484000000001,84.21484166666666
file name : Image_27092021150131274.png
|
2021-09-27 15:01:31.368944 |
32 |
54562086 |
GRAM PANCHAYAT JANARI ME VIBHINN STHANO PAR SOKHTA KA NIRMAN KARY |
600000 |
GRAM PANCHAYAT JANARI ME VIBHINN STHANO PAR SOKHTA KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.748883333333332,25.748885000000005
Longitude : 84.21477833333331,84.21482499999999
file name : Image_27092021150123231.png
|
2021-09-27 15:01:23.320753 |
33 |
54561927 |
JANARI ME VIBHINN KSHATIGRAST MARG PAR EET KA TUKDA BHARAI KA KARY |
600000 |
JANARI ME VIBHINN KSHATIGRAST MARG PAR EET KA TUKDA BHARAI KA KARY1 |
Completion of work |
-
latitude : 25.74878833333333,25.74883333333333
Longitude : 84.21485333333334,84.21485333333334
file name : Image_27092021150127433.png
|
2021-09-27 15:01:27.513665 |
34 |
55984330 |
RING BANDHE SE MUNNA PANDEY K GHAR K PICHE TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY |
600000 |
RING BANDHE SE MUNNA PANDEY K GHAR K PICHE TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.75935666666667,25.75935666666667
Longitude : 84.16694666666666,84.16694666666666
file name : Image_16122021205843739.png
|
2021-12-16 20:58:43.846067 |
35 |
54561958 |
JANARI ME VIBHINN STHANO PAR SOKHTA KA NIRMAN KARY |
600000 |
JANARI ME VIBHINN STHANO PAR SOKHTA KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.759398333333333,25.759398333333333
Longitude : 84.16701833333333,84.16701833333333
file name : Image_02022022224655189.png
|
2022-02-02 22:46:55.316877 |
36 |
62062015 |
KUAA NIRMAN KARY |
1500000 |
KUAA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.763506666666665,25.763505000000002
Longitude : 84.15300666666666,84.15282666666666
file name : Image_19062022153717507.png
|
2022-06-19 15:37:17.594886 |
37 |
62063367 |
PRASHASHNIK BYAY |
1500000 |
PRASHASHNIK BYAY1 |
Completion of work |
-
latitude : 25.7772994,25.7772994
Longitude : 84.1493474,84.1493474
file name : Image_11102022224030140.png
|
2022-10-11 22:40:30.527148 |
38 |
62063090 |
OMPRAKASH SAHNI K GHAR SE BABBAN YADAV K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY |
225782 |
OMPRAKASH SAHNI K GHAR SE BABBAN YADAV K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.7772224,25.7772224,25.7772197
Longitude : 84.1494143,84.1494143,84.1494114
file name : Image_12112022153429566.png
|
2022-11-12 15:34:29.669222 |
39 |
62062585 |
RAJESH GUPTA K GHAR SE SANTOSH SAHNI K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY |
235893 |
RAJESH GUPTA K GHAR SE SANTOSH SAHNI K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.777175,25.7771827
Longitude : 84.149355,84.149361
file name : Image_18112022120421058.png
|
2022-11-18 12:04:21.146179 |
40 |
62063029 |
RAMPRASAD K GHAR SE SATYANARAYAN YADAV K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY |
344691 |
RAMPRASAD K GHAR SE SATYANARAYAN YADAV K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.7772182,25.7772187,25.7772187
Longitude : 84.1494167,84.149417,84.149417
file name : Image_17122022094534232.png
|
2022-12-17 09:45:34.345543 |
41 |
62063348 |
INDIA MARKA II HAND PUMP REBOR KARY |
74000 |
INDIA MARKA II HAND PUMP REBOR KARY1 |
Completion of work |
-
latitude : 25.74891155,25.74891171
Longitude : 84.21475761,84.2147575
file name : Image_14022023150151857.png
|
2023-02-14 15:01:51.948967 |
42 |
62063389 |
LIGHT KA KARY |
122178 |
LIGHT KA KARY1 |
Completion of work |
-
latitude : 25.74891358,25.74891368
Longitude : 84.21475456,84.21475435
file name : Image_14022023150148603.png
|
2023-02-14 15:01:48.685538 |
43 |
62063020 |
GORAKH YADAV K GHAR SE JANGALI YADAV K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY |
150000 |
GORAKH YADAV K GHAR SE JANGALI YADAV K GHAR TAK INTERLOCKING PEVERSH BLOCK ROAD KA NIRMAN KARY1 |
Completion of work |
-
latitude : 25.747767,25.747767
Longitude : 84.2168462,84.2168462
file name : Image_14022023150141022.png
|
2023-02-14 15:01:41.098423 |
44 |
62063339 |
INDIA MARKA II HAND PUMP MARAMAT KARY |
224000 |
INDIA MARKA II HAND PUMP MARAMAT KARY1 |
Completion of work |
-
latitude : 25.74890871,25.74890908
Longitude : 84.21472137,84.21472097
file name : Image_14022023150258933.png
|
2023-02-14 15:02:59.01507 |
45 |
65648060 |
Construction of Community Sanitary Complex |
164000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.74892703,25.74892569
Longitude : 84.21472697,84.21472727
file name : Image_14022023150144414.png
|
2023-02-14 15:01:44.520495 |
46 |
68853302 |
Construction of Community Sanitary Complex |
105000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.7480964
Longitude : 84.2158581
file name : Image_06052023112050103.png
|
2023-05-06 11:20:50.210947 |
47 |
68853244 |
RAMNIWASH K GHAR SE PRATHMIK VIDYALAYA JANARI NO.1 TAK JIG JAG INTERLOCKING KARY |
406000 |
RAMNIWASH K GHAR SE PRATHMIK VIDYALAYA JANARI NO.1 TAK JIG JAG INTERLOCKING KARY1 |
Completion of work |
-
latitude : 25.748918333333336,25.748918333333336
Longitude : 84.21469333333334,84.21469333333334
file name : Image_06052023112113155.png
|
2023-05-06 11:21:13.265232 |
48 |
68853190 |
Construction of Community Sanitary Complex |
185000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.748845
Longitude : 84.21478333333334
file name : Image_06052023112241898.png
|
2023-05-06 11:22:41.997273 |
49 |
74137804 |
SHIVNATH SAHNI K GHAR SE MOTILAL SAHNI K GHAR HOTE HUWE DIH BABA K STHAN TAK JIG JAG INTERLOCKING KA |
1000000 |
SHIVNATH SAHNI K GHAR SE MOTILAL SAHNI K GHAR HOTE HUWE DIH BABA K STHAN TAK JIG JAG INTERLOCKING KA1 |
Completion of work |
-
latitude : 25.748904999999997,25.748904999999997
Longitude : 84.21477000000002,84.21477000000002
file name : Image_06052023112640932.png
|
2023-05-06 11:26:41.043843 |
50 |
74138434 |
GOPAL PANDEY K GHAR K BAGAL ME CHABUTARA NIRMAN AUR TILES KA KARY |
500000 |
GOPAL PANDEY K GHAR K BAGAL ME CHABUTARA NIRMAN AUR TILES KA KARY 1 |
Completion of work |
-
latitude : 25.748853333333333,25.74885
Longitude : 84.21475833333334,84.21476333333334
file name : Image_06052023112703719.png
|
2023-05-06 11:27:03.819154 |
51 |
68853210 |
Construction of Community Sanitary Complex |
162000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.748876666666668
Longitude : 84.21475000000001
file name : Image_06052023112542565.png
|
2023-05-06 11:25:42.672949 |
52 |
54562070 |
GRAM PANCHAYAT JANARI ME VIBHINN STHANO PAR INDIA MARKA II HAND PUMP REBOR KA KARY |
400000 |
GRAM PANCHAYAT JANARI ME VIBHINN STHANO PAR INDIA MARKA II HAND PUMP REBOR KA KARY1 |
Completion of work |
-
latitude : 25.759438333333332,25.759438333333332
Longitude : 84.16706166666667,84.16706166666667
file name : Image_06092023132832367.png
|
2023-09-06 13:28:32.471156 |
53 |
74138630 |
Construction of Community Sanitary Complex |
400000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.759438333333332
Longitude : 84.16706166666667
file name : Image_06092023132839735.png
|
2023-09-06 13:28:39.821914 |
54 |
55083666 |
GRAM PANCHAYAT JANARI K SAPHA ME KUAA KA JIRWODWAR KA KARY |
400000 |
GRAM PANCHAYAT JANARI K SAPHA ME KUAA KA JIRWODWAR KA KARY1 |
Completion of work |
-
latitude : 25.759438333333332,25.759438333333332
Longitude : 84.16706166666667,84.16706166666667
file name : Image_06092023132835729.png
|
2023-09-06 13:28:35.8146 |
55 |
87321851 |
Construction of Community Sanitary Complex |
1000000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.759438333333332
Longitude : 84.16706166666667
file name : Image_06092023132844007.png
|
2023-09-06 13:28:44.08561 |
56 |
68993428 |
Construction of Community Sanitary Complex |
500000 |
GRAM PANCHAYAT JANARI ME VIBHINN STHANO PAR RAVISH TUKDA BHARAI KARY |
Completion of work |
-
latitude : 25.747017
Longitude : 84.2165168
file name : Image_02112023173242013.png
|
2023-11-02 17:32:42.094768 |
57 |
68992693 |
Construction of Community Sanitary Complex |
490000 |
MANOJ GIRI K GHAR SE MAHENDAR GIRI K GHAR HOTE HUWE KANDHAI BABA K MANDIR TAK NALI AUR JIG JAG INTERLOCKI |
Plinth level |
-
latitude : 25.748820000000002
Longitude : 84.21476333333334
file name : Image_12012024151634340.png
|
2024-01-12 15:16:34.451676 |
58 |
68992693 |
Construction of Community Sanitary Complex |
490000 |
MANOJ GIRI K GHAR SE MAHENDAR GIRI K GHAR HOTE HUWE KANDHAI BABA K MANDIR TAK NALI AUR JIG JAG INTERLOCKI |
Completion of work |
-
latitude : 25.748916666666666
Longitude : 84.21465166666667
file name : Image_12012024151529880.png
|
2024-01-12 15:15:29.983731 |
59 |
68993071 |
Construction of Community Sanitary Complex |
303201 |
SHRIKANT GIRI GHAR SE SARVJEET GIRI K GHAR HOTE HUWE RANGLAL GIRI K GHAR TAK JIG JAG INTERLOCKING KARY |
Roof laid |
-
latitude : 25.748895
Longitude : 84.21472
file name : Image_12012024160233046.png
|
2024-01-12 16:02:33.146733 |
60 |
68993071 |
Construction of Community Sanitary Complex |
303201 |
SHRIKANT GIRI GHAR SE SARVJEET GIRI K GHAR HOTE HUWE RANGLAL GIRI K GHAR TAK JIG JAG INTERLOCKING KARY |
Plinth level |
-
latitude : 25.748845
Longitude : 84.21472
file name : Image_12012024160030172.png
|
2024-01-12 16:00:30.275381 |
61 |
68993071 |
Construction of Community Sanitary Complex |
303201 |
SHRIKANT GIRI GHAR SE SARVJEET GIRI K GHAR HOTE HUWE RANGLAL GIRI K GHAR TAK JIG JAG INTERLOCKING KARY |
Completion of work |
-
latitude : 25.74886333333333
Longitude : 84.21466666666666
file name : Image_12012024155913156.png
|
2024-01-12 15:59:13.251673 |
62 |
68993539 |
Construction of roads |
91000 |
OMPRAKASH PASWAN K GHAR SE LUTAN PASWAN K GHAR TAK INTERLOCKING NIRMAN KARY |
Plinth level |
-
latitude : 25.748795000000005,25.748795000000005
Longitude : 84.21432333333333,84.21432333333333
file name : Image_17052024103641314.png
|
2024-05-17 10:36:41.400548 |
63 |
68993539 |
Construction of roads |
91000 |
OMPRAKASH PASWAN K GHAR SE LUTAN PASWAN K GHAR TAK INTERLOCKING NIRMAN KARY |
Completion of work |
-
latitude : 25.7466485,25.7466485
Longitude : 84.2165168,84.2165168
file name : Image_17052024103533478.png
|
2024-05-17 10:35:33.566653 |
64 |
68992920 |
Construction of roads |
500000 |
RING BANDHA NAMO YADAV K GHAR SE OMNATH PANDEY K GHAR HOTE HUWE SHRI BHAGWAN PANDEY K GHAR TAK JIG JAG |
Plinth level |
-
latitude : 25.7594306,25.7594306
Longitude : 84.1670038,84.1670038
file name : Image_23032024180001873.png
|
2024-03-23 18:00:01.935688 |
65 |
68992920 |
Construction of roads |
500000 |
RING BANDHA NAMO YADAV K GHAR SE OMNATH PANDEY K GHAR HOTE HUWE SHRI BHAGWAN PANDEY K GHAR TAK JIG JAG |
Completion of work |
-
latitude : 25.7594306,25.7594306
Longitude : 84.1670042,84.1670042
file name : Image_23032024175137280.png
|
2024-03-23 17:51:37.26641 |
66 |
68992843 |
Construction of roads |
150000 |
BHOLA YADAV K GHAR SE SAHDEV YADAV K GHAR TAK JIG JAG INTERLOCKING KARY |
Plinth level |
-
latitude : 25.7594305,25.7594305
Longitude : 84.1670043,84.1670043
file name : Image_23032024175957776.png
|
2024-03-23 17:59:57.859503 |
67 |
68992843 |
Construction of roads |
150000 |
BHOLA YADAV K GHAR SE SAHDEV YADAV K GHAR TAK JIG JAG INTERLOCKING KARY |
Completion of work |
-
latitude : 25.7594309,25.7594309
Longitude : 84.167004,84.167004
file name : Image_23032024175133599.png
|
2024-03-23 17:51:33.380509 |
68 |
107048498 |
Construction of roads |
248000 |
RAJESH PANDEY K GHAR SE UMA GOND K GHAR HOTE HUWE AWADHESH PANDEY K GATE TAK JIG JAG INTERLOCKING KARY |
Plinth level |
-
latitude : 25.74894,25.748935
Longitude : 84.21426000000001,84.214255
file name : Image_29092024145913907.png
|
2024-09-29 14:59:13.959597 |
69 |
107048498 |
Construction of roads |
248000 |
RAJESH PANDEY K GHAR SE UMA GOND K GHAR HOTE HUWE AWADHESH PANDEY K GATE TAK JIG JAG INTERLOCKING KARY |
Completion of work |
-
latitude : 25.749115,25.749115
Longitude : 84.214755,84.214755
file name : Image_29092024145443429.png
|
2024-09-29 14:54:43.494234 |
70 |
107048645 |
Connecting septic tanks with soak pits |
171000 |
VIBHINN STHANO PAR SOKHTA NIRMAN KARY |
Plinth level |
-
latitude : 25.748933333333337
Longitude : 84.21422
file name : Image_29092024145922678.png
|
2024-09-29 14:59:22.729885 |
71 |
107048645 |
Connecting septic tanks with soak pits |
171000 |
VIBHINN STHANO PAR SOKHTA NIRMAN KARY |
Completion of work |
-
latitude : 25.74887833333333
Longitude : 84.21518166666668
file name : Image_29092024145452089.png
|
2024-09-29 14:54:52.151634 |
72 |
103296991 |
Construction of roads |
388000 |
SURAJ PANDEY K GHAR SE PWD ROAD TAK JIG JAG INTERLOCKING KARY |
Plinth level |
-
latitude : 25.748746666666662,25.748746666666662
Longitude : 84.21465833333332,84.21465833333332
file name : Image_29092024145911213.png
|
2024-09-29 14:59:11.263116 |
73 |
103296991 |
Construction of roads |
388000 |
SURAJ PANDEY K GHAR SE PWD ROAD TAK JIG JAG INTERLOCKING KARY |
Completion of work |
-
latitude : 25.7537805,25.7537805
Longitude : 84.2198106,84.2198106
file name : Image_29092024145440739.png
|
2024-09-29 14:54:40.806194 |
74 |
107048508 |
Creation of a new source of drinking water |
180000 |
VIBHINN STHANO PAR INDIA MARKA II HAND PUMP REBOR KARY |
Plinth level |
-
latitude : 25.748933333333337
Longitude : 84.21422
file name : Image_29092024145919477.png
|
2024-09-29 14:59:19.542875 |
75 |
107048508 |
Creation of a new source of drinking water |
180000 |
VIBHINN STHANO PAR INDIA MARKA II HAND PUMP REBOR KARY |
Completion of work |
-
latitude : 25.748941666666664
Longitude : 84.21560166666669
file name : Image_29092024145449300.png
|
2024-09-29 14:54:49.351942 |
76 |
107048502 |
Creation of a new source of drinking water |
200000 |
VIBHINN STHANO PAR INDIA MARKA II HAND PUMP MARAMAT KARY |
Plinth level |
-
latitude : 25.748933333333337
Longitude : 84.21422
file name : Image_29092024145916689.png
|
2024-09-29 14:59:16.74625 |
77 |
107048502 |
Creation of a new source of drinking water |
200000 |
VIBHINN STHANO PAR INDIA MARKA II HAND PUMP MARAMAT KARY |
Completion of work |
-
latitude : 25.748941666666664
Longitude : 84.21560166666669
file name : Image_29092024145446665.png
|
2024-09-29 14:54:46.724094 |
78 |
107048487 |
Construction of roads |
702000 |
VINOD PANDEY K GHAR SE ARVIND PANDEY K GHAR HOTE HUWE MUNNA PANDEY K GHAR TAK JIG JAG INTERLOCKING KARY |
Plinth level |
-
latitude : 25.748915000000004,25.748915000000004
Longitude : 84.21469333333334,84.21469333333334
file name : Image_20072024153614882.png
|
2024-07-20 15:36:14.943132 |
79 |
107048487 |
Construction of roads |
702000 |
VINOD PANDEY K GHAR SE ARVIND PANDEY K GHAR HOTE HUWE MUNNA PANDEY K GHAR TAK JIG JAG INTERLOCKING KARY |
Completion of work |
-
latitude : 25.749123333333333,25.749123333333333
Longitude : 84.214845,84.214845
file name : Image_20072024153512236.png
|
2024-07-20 15:35:12.297738 |