1 |
54249613 |
Construction of Boundary wall and Get work in Primary School Gaura 2nd |
397000 |
Construction of Boundary wall and Get work in Primary School Gaura 2nd1 |
Completion of work |
-
latitude : 25.43548555991368
Longitude : 81.9170113690831
file name : Image_19102021113906161.png
|
2021-10-19 11:39:06.257322 |
2 |
54220607 |
Construction of Interlocking Khadanja work in Purva Madhyamik School Fild |
250000 |
Construction of Interlocking Khadanja work in Purva Madhyamik School Fild1 |
Completion of work |
-
latitude : 25.43545364284189,25.435475957730056
Longitude : 81.91699769965209,81.91696811152377
file name : Image_22102021085203322.png
|
2021-10-22 08:52:03.42595 |
3 |
54220607 |
Construction of Interlocking Khadanja work in Purva Madhyamik School Fild |
250000 |
Construction of Interlocking Khadanja work in Purva Madhyamik School Fild1 |
Completion of work |
-
latitude : 25.43538001133949,25.435447278179918
Longitude : 81.91694502188567,81.91699673876225
file name : Image_22102021085542986.png
|
2021-10-22 08:55:43.079944 |
4 |
54011826 |
Hand pump Re Bore work |
500000 |
Hand pump Re Bore work1 |
Completion of work |
-
latitude : 25.435536106004548
Longitude : 81.91703183480413
file name : Image_22102021082157186.png
|
2021-10-22 08:21:57.267087 |
5 |
50305876 |
SAMUDAYIK SHAUCHALY ME SAF SAFAI HETU SAMAGRI PR BYAY |
400000 |
SAMUDAYIK SHAUCHALY ME SAF SAFAI HETU SAMAGRI PR BYAY1 |
Completion of work |
-
latitude : 25.12712272266172,25.1270485
Longitude : 82.39496494934247,82.3947683
file name : Image_04072021142317459.png
|
2021-07-04 14:23:17.543642 |
6 |
60727489 |
Hand Pump Re Bore work |
850000 |
Hand Pump Re Bore work 1 |
Completion of work |
-
latitude : 25.43540978479672
Longitude : 81.91694498642227
file name : Image_27062022214720562.png
|
2022-06-27 21:47:20.647049 |
7 |
54011352 |
Maintenance of Hand pump work |
900000 |
Maintenance of Hand pump work1 |
Completion of work |
-
latitude : 25.435557293603367
Longitude : 81.91700878055514
file name : Image_22102021081917520.png
|
2021-10-22 08:19:17.606736 |
8 |
55470837 |
Construction of Interlocking Khadanja and Mitti work in Purva Madhyamik Vidyalay Gaura Avashesh Bhag |
200000 |
Construction of Interlocking Khadanja and Mitti work in Purva Madhyamik Vidyalay Gaura Avashesh Bhag1 |
Completion of work |
-
latitude : 25.154649435938673,25.15456460469787
Longitude : 82.38587584121876,82.3860336555566
file name : Image_20112021120713162.png
|
2021-11-20 12:07:13.241691 |
9 |
54220705 |
Construction of Underground Nali work from Main road to Talab tak |
388000 |
Construction of Underground Nali work from Main road to Talab tak1 |
Completion of work |
-
latitude : 25.43542823297863,25.43549537916183
Longitude : 81.91701950567776,81.91702028745873
file name : Image_08012022195809061.png
|
2022-01-08 19:58:09.165856 |
10 |
54011427 |
Maintenance of Hand pump work |
400000 |
Maintenance of Hand pump work1 |
Completion of work |
-
latitude : 25.43553803402179
Longitude : 81.91702351074493
file name : Image_08012022194817027.png
|
2022-01-08 19:48:17.130776 |
11 |
104694564 |
Construction of roads |
500000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.1922523,25.1921802
Longitude : 82.3224965,82.3222754
file name : Image_26102024110536917.png
|
2024-10-26 11:05:36.993101 |
12 |
104694564 |
Construction of roads |
500000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.426405,25.426416666666668
Longitude : 81.91496166666667,81.91506166666666
file name : Image_25082024133207567.png
|
2024-08-25 13:32:07.664398 |
13 |
104694564 |
Construction of roads |
500000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.4264939,25.4264649
Longitude : 81.9145401,81.9145367
file name : Image_24082024200108661.png
|
2024-08-24 20:01:08.725301 |
14 |
104694564 |
Construction of roads |
500000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.4262316,25.4262773
Longitude : 81.9144483,81.9144141
file name : Image_24082024194706763.png
|
2024-08-24 19:47:06.841273 |
15 |
55470914 |
Construction of Interlocking Khadanja work in Nagari Nath Temple Fild |
748000 |
Construction of Interlocking Khadanja work in Nagari Nath Temple Fild1 |
Completion of work |
-
latitude : 25.2899031,25.2898538,25.2898538
Longitude : 82.4216286,82.4215067,82.4215067
file name : Image_28012022161514057.png
|
2022-01-28 16:15:14.235323 |
16 |
60727486 |
Hand Pump Re Bore work |
800000 |
Hand Pump Re Bore work1 |
Completion of work |
-
latitude : 25.435484657956025
Longitude : 81.91703056037635
file name : Image_22042022221538551.png
|
2022-04-22 22:15:38.643557 |
17 |
60726554 |
Construction of Sock Pit and Nali work |
600000 |
Construction of Sock Pit and Nali work1 |
Completion of work |
-
latitude : 25.4353265
Longitude : 81.9169333
file name : Image_22042022222201782.png
|
2022-04-22 22:22:01.873905 |
18 |
60727494 |
Hand Pump Re Bore work |
700000 |
Hand Pump Re Bore work1 |
Completion of work |
-
latitude : 25.256234539226515
Longitude : 82.30736755433271
file name : Image_20052022131148856.png
|
2022-05-20 13:11:48.94029 |
19 |
44791078 |
NALI NIRMAN WORK IN GRAM PANCHAYAT |
206000 |
NALI NIRMAN WORK IN GRAM PANCHAYAT 1 |
Completion of work |
-
latitude : 25.43544939702893,25.435421239980776
Longitude : 81.9169509594191,81.91706426245972
file name : Image_07062022193053718.png
|
2022-06-07 19:30:53.78725 |
20 |
60689808 |
Maintenance of Hand Pump work |
800000 |
Maintenance of Hand Pump work 1 |
Completion of work |
-
latitude : 25.435482383071122
Longitude : 81.91704218182763
file name : Image_21072022193054386.png
|
2022-07-21 19:30:54.461078 |
21 |
54220897 |
Construction of Interlocking Khadanja work from CC road to Khadanja tak |
497000 |
Construction of Interlocking Khadanja work from CC road to Khadanja tak1 |
Completion of work |
-
latitude : 25.208023836962372,25.20802496937242,25.208041210693676
Longitude : 82.32750081832727,82.32749029589961,82.32760589519846
file name : Image_27082022124354470.png
|
2022-08-27 12:43:54.650254 |
22 |
60769524 |
Construction of Boundary wall and get work in Panchayat Bhawan |
300000 |
Construction of Boundary wall and get work in Panchayat Bhawan1 |
Completion of work |
-
latitude : 25.19797785591339
Longitude : 82.1249347652707
file name : Image_15092022143210145.png
|
2022-09-15 14:32:10.249868 |
23 |
65196601 |
Construction of Underground Hyum Pipe Nali work from Brijnath House to Talab tak |
184000 |
Construction of Underground Hyum Pipe Nali work from Brijnath House to Talab tak1 |
Completion of work |
-
latitude : 25.258578341281652,25.258588317576084
Longitude : 82.31443549685326,82.31445697639853
file name : Image_21092022161723541.png
|
2022-09-21 16:17:23.614935 |
24 |
65196677 |
Construction of Underground Hyum Pipe Nali work from Shamser Singh House to Harigen Singh House tak |
53000 |
Construction of Underground Hyum Pipe Nali work from Shamser Singh House to Harigen Singh House tak1 |
Completion of work |
-
latitude : 25.25918928910581,25.259434890465602,25.25951914969084
Longitude : 82.31408652609171,82.31406730130279,82.31399852315452
file name : Image_21092022162042901.png
|
2022-09-21 16:20:42.976285 |
25 |
60726050 |
Construction of Hand Pump Foundation and Nali and Sock Pit work |
700000 |
Construction of Hand Pump Foundation and Nali and Sock Pit work1 |
Completion of work |
-
latitude : 25.43539094623939
Longitude : 81.91693999167204
file name : Image_06112022160333583.png
|
2022-11-06 16:03:33.656891 |
26 |
65198449 |
Nali work in Gp |
400000 |
Nali work in Gp1 |
Completion of work |
-
latitude : 25.43558899215386,25.4355505510072,25.435568776326853,25.43558992011635,25.43558820048113,25.43558820048113
Longitude : 81.91700437616657,81.91698653681888,81.9170055725192,81.91701061773209,81.91700886158206,81.91700886158206
file name : Image_16112022172733528.png
|
2022-11-16 17:27:33.627416 |
27 |
54488407 |
Construction of Nali worse to from Radheshyam Prajapati house to Amarlal Yadav house tak |
499000 |
Construction of Nali worse to from Radheshyam Prajapati house to Amarlal Yadav house tak1 |
Completion of work |
-
latitude : 25.15718837397291,25.157154706364736
Longitude : 82.4094692003948,82.40947566217665
file name : Image_15122022105154968.png
|
2022-12-15 10:51:55.071241 |
28 |
54036727 |
Samudaik Toilet Dekh Rekh and Mandey work |
400000 |
Samudaik Toilet Dekh Rekh and Mandey work 1 |
Completion of work |
-
latitude : 25.1426574
Longitude : 82.5821103
file name : Image_09122022111855533.png
|
2022-12-09 11:18:55.612559 |
29 |
60726700 |
Hand Pump Re - Bore work |
1000000 |
Hand Pump Re - Bore work 1 |
Completion of work |
-
latitude : 25.133044
Longitude : 82.5686629
file name : Image_28122022163951416.png
|
2022-12-28 16:39:51.50416 |
30 |
60726363 |
Construction of interlocking Khadanja work in Panchayat Bhawan Ground |
848000 |
Construction of interlocking Khadanja work in Panchayat Bhawan Ground 1 |
Completion of work |
-
latitude : 25.155145870738707,25.155147601798156
Longitude : 82.39308395127003,82.39308826982591
file name : Image_10012023155821047.png
|
2023-01-10 15:58:21.167097 |
31 |
67551184 |
Street Light work |
464520 |
Street Light work 1 |
Completion of work |
-
latitude : 25.435616313414297
Longitude : 81.9170148717026
file name : Image_15042023192615225.png
|
2023-04-15 19:26:15.309324 |
32 |
67549093 |
Construction of Interlocking Khadanja work from Vijya Nand Upadhyay house to Sheshman Singh house ta |
409000 |
Construction of Interlocking Khadanja work from Vijya Nand Upadhyay house to Sheshman Singh house ta1 |
Completion of work |
-
latitude : 25.1340829,25.1341095
Longitude : 82.5805704,82.5805633
file name : Image_26062023142756856.png
|
2023-06-26 14:27:56.941403 |
33 |
67549093 |
Construction of Interlocking Khadanja work from Vijya Nand Upadhyay house to Sheshman Singh house ta |
409000 |
Construction of Interlocking Khadanja work from Vijya Nand Upadhyay house to Sheshman Singh house ta1 |
Completion of work |
-
latitude : 25.191498235546593,25.191617654635444
Longitude : 82.32268942143315,82.32221391560965
file name : Image_28062023123009847.png
|
2023-06-28 12:30:09.962177 |
34 |
67549153 |
Construction of Interlocking Khadanja work from Sheshman Singh house to Ram Jiyavan Bhuj House tak |
409000 |
Construction of Interlocking Khadanja work from Sheshman Singh house to Ram Jiyavan Bhuj House tak1 |
Completion of work |
-
latitude : 25.192679155371344,25.19252135989915,25.19252135989915
Longitude : 82.32213816733977,82.3225099223773,82.3225099223773
file name : Image_28062023123747304.png
|
2023-06-28 12:37:47.390217 |
35 |
67549153 |
Construction of Interlocking Khadanja work from Sheshman Singh house to Ram Jiyavan Bhuj House tak |
409000 |
Construction of Interlocking Khadanja work from Sheshman Singh house to Ram Jiyavan Bhuj House tak1 |
Completion of work |
-
latitude : 25.19214203946171,25.192079762299063,25.192070996290916
Longitude : 82.32095854446526,82.32106583168715,82.32108631408349
file name : Image_28062023131215137.png
|
2023-06-28 13:12:15.115203 |
36 |
75009102 |
Drinking water facilities |
500000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 25.208799005674354
Longitude : 82.32518846649461
file name : Image_06072023144257824.png
|
2023-07-06 14:42:57.919926 |
37 |
86875773 |
Panchayat Bhawan Confrence Holl and Office Room Kaya Kalp Work |
800000 |
Panchayat Bhawan Confrence Holl and Office Room Kaya Kalp Work 1 |
Completion of work |
-
latitude : 25.43544867946723
Longitude : 81.91692513887118
file name : Image_06082023202909825.png
|
2023-08-06 20:29:09.907 |
38 |
74997882 |
Construction of roads |
464000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.435413645623267,25.43542324061448
Longitude : 81.9169559243842,81.9169200011371
file name : Image_03082023211135083.png
|
2023-08-03 21:11:35.179382 |
39 |
74997882 |
Construction of roads |
464000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.12717887045597,25.127210860118932
Longitude : 82.39471549458672,82.3946928243379
file name : Image_07022024141846006.png
|
2024-02-07 14:18:46.117883 |
40 |
74997882 |
Construction of roads |
464000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.1270681,25.1270601
Longitude : 82.3945912,82.3946562
file name : Image_25072023152136959.png
|
2023-07-25 15:21:37.135581 |
41 |
86876644 |
Construction of Interlocking Khadanja Work in Gram Panchayat |
800000 |
Construction of Interlocking Khadanja Work in Gram Panchayat 1 |
Completion of work |
-
latitude : 25.127238592293036,25.127238592293036
Longitude : 82.39400977624874,82.39400977624874
file name : Image_11082023170346517.png
|
2023-08-11 17:03:46.596458 |
42 |
67550968 |
Water Supply to villages |
800000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.43556591182879
Longitude : 81.91697848114026
file name : Image_08092023070833635.png
|
2023-09-08 07:08:33.706409 |
43 |
67550847 |
Water Supply to villages |
1000000 |
Water Supply to villages1 |
Completion of work |
-
latitude : 25.4358452
Longitude : 81.9165893
file name : Image_08092023070735189.png
|
2023-09-08 07:07:35.249029 |
44 |
86876642 |
Construction of Interlocking Khadanja Work in Gram Panchayat |
800000 |
Construction of Interlocking Khadanja Work in Gram Panchayat 1 |
Completion of work |
-
latitude : 25.191739481637974,25.19177899335102
Longitude : 82.32319737371549,82.32325293885003
file name : Image_07102023141235116.png
|
2023-10-07 14:12:35.221522 |
45 |
86875488 |
Panchayat Bhawan Kaya Kalp work in Gaura |
700000 |
Panchayat Bhawan Kaya Kalp work in Gaura 1 |
Completion of work |
-
latitude : 25.171036164174506
Longitude : 82.2114328394773
file name : Image_23092023141822429.png
|
2023-09-23 14:18:22.511 |
46 |
75006940 |
Drainage Construction |
400000 |
Drainage Construction1 |
Plinth level |
-
latitude : 25.435411158116793
Longitude : 81.91694555120708
file name : Image_12042024182048405.png
|
2024-04-12 18:20:48.486218 |
47 |
75006940 |
Drainage Construction |
400000 |
Drainage Construction1 |
Plinth level |
-
latitude : 25.4354925
Longitude : 81.9165987
file name : Image_01052024220611089.png
|
2024-05-01 22:06:11.17364 |
48 |
75006940 |
Drainage Construction |
400000 |
Drainage Construction1 |
Completion of work |
-
latitude : 25.4356171
Longitude : 81.9168194
file name : Image_12042024181255163.png
|
2024-04-12 18:12:55.237226 |
49 |
89171630 |
Purchase of Bartan work in 10 unit Anganbadi Kendra Gaura |
700000 |
Purchase of Bartan work in 10 unit Anganbadi Kendra Gaura 1 |
Completion of work |
-
latitude : 25.15479392100699
Longitude : 82.38598363278139
file name : Image_09012024125738957.png
|
2024-01-09 12:57:39.032854 |
50 |
89172070 |
Operation & maintenance of community sanitary complex |
400000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 25.154714269896168
Longitude : 82.3859613483545
file name : Image_09012024124948215.png
|
2024-01-09 12:49:48.299652 |
51 |
89171581 |
Construction of Bhusa Room work in Gaushala Kendra Par |
1000000 |
Construction of Bhusa Room work in Gaushala Kendra Par1 |
Completion of work |
-
latitude : 25.153296281807485
Longitude : 82.37826588625695
file name : Image_09012024124056001.png
|
2024-01-09 12:40:56.090884 |
52 |
89172209 |
Construction of Chabutra work in Gram Panchayat |
600000 |
Construction of Chabutra work in Gram Panchayat 1 |
Completion of work |
-
latitude : 25.154803770193958
Longitude : 82.38597452444836
file name : Image_09012024125359366.png
|
2024-01-09 12:53:59.443235 |
53 |
89172209 |
Construction of Chabutra work in Gram Panchayat |
600000 |
Construction of Chabutra work in Gram Panchayat 1 |
Completion of work |
-
latitude : 25.1533014953945
Longitude : 82.37822816562715
file name : Image_09012024124223126.png
|
2024-01-09 12:42:23.201673 |
54 |
89172113 |
Construction of Community Sanitary Complex |
200000 |
Construction of Community Sanitary Complex1 |
Completion of work |
-
latitude : 25.1547968965568
Longitude : 82.3859275939623
file name : Image_09012024125243755.png
|
2024-01-09 12:52:43.834823 |
55 |
90669822 |
Boundary wall and Gate |
600000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 25.435199887273896
Longitude : 81.91690445664534
file name : Image_09022024084211000.png
|
2024-02-09 08:42:11.080579 |
56 |
90669822 |
Boundary wall and Gate |
600000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 25.142280817019703
Longitude : 82.39199858711801
file name : Image_08022024163725841.png
|
2024-02-08 16:37:25.941431 |
57 |
90669822 |
Boundary wall and Gate |
600000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 25.127163746448463
Longitude : 82.3946553992695
file name : Image_07022024144609867.png
|
2024-02-07 14:46:09.96054 |
58 |
90669822 |
Boundary wall and Gate |
600000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 25.1271403
Longitude : 82.3946604
file name : Image_07022024143035670.png
|
2024-02-07 14:30:35.753071 |
59 |
91555631 |
Boundary wall and Gate |
600000 |
Boundary wall and Gate1 |
Completion of work |
-
latitude : 25.43524941809074
Longitude : 81.91694357763626
file name : Image_09022024125508692.png
|
2024-02-09 12:55:08.78859 |
60 |
91560472 |
Construction of roads |
500000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.435728,25.435728
Longitude : 81.9165657,81.9165657
file name : Image_18022024123923835.png
|
2024-02-18 12:39:23.931319 |
61 |
91560472 |
Construction of roads |
500000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.435571734833715,25.435549662584076
Longitude : 81.91698715565887,81.91700163299889
file name : Image_18022024083836636.png
|
2024-02-18 08:38:36.718592 |
62 |
90316111 |
Drinking water facilities |
500000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 25.435728
Longitude : 81.9165657
file name : Image_18022024123634456.png
|
2024-02-18 12:36:34.549611 |
63 |
90316111 |
Drinking water facilities |
500000 |
Drinking water facilities1 |
Completion of work |
-
latitude : 25.435520478284122
Longitude : 81.91700493546017
file name : Image_18022024083458987.png
|
2024-02-18 08:34:59.063599 |
64 |
90670071 |
Construction of Building |
600000 |
Construction of Building1 |
Plinth level |
-
latitude : 25.1350121
Longitude : 82.56159
file name : Image_02032024114053165.png
|
2024-03-02 11:40:53.245976 |
65 |
90670071 |
Construction of Building |
600000 |
Construction of Building1 |
Completion of work |
-
latitude : 25.435728
Longitude : 81.9165657
file name : Image_18022024123758410.png
|
2024-02-18 12:37:58.492444 |
66 |
90670071 |
Construction of Building |
600000 |
Construction of Building1 |
Completion of work |
-
latitude : 25.435125200967008
Longitude : 81.91695296551316
file name : Image_18022024083343232.png
|
2024-02-18 08:33:43.308133 |
67 |
86876513 |
Construction of Interlocking Khdanja work in Gram Panchayat |
500000 |
Construction of Interlocking Khdanja work in Gram Panchayat 1 |
Completion of work |
-
latitude : 25.40672595756092,25.406723753647412,25.40672662297347
Longitude : 81.97224083939996,81.97223682785035,81.97221855398716
file name : Image_18122023171943348.png
|
2023-12-18 17:19:43.431924 |
68 |
89172262 |
Operation & maintenance of community sanitary complex |
600000 |
Operation & maintenance of community sanitary complex1 |
Completion of work |
-
latitude : 25.125793461143466
Longitude : 82.56444043378589
file name : Image_02032024113024440.png
|
2024-03-02 11:30:23.85555 |
69 |
86876525 |
Construction of Interlocking Khadanja Work in Gram Panchayat |
700000 |
Construction of Interlocking Khadanja Work in Gram Panchayat1 |
Completion of work |
-
latitude : 25.4357646,25.4357646
Longitude : 81.9166008,81.9166008
file name : Image_12032024093109609.png
|
2024-03-12 09:31:09.702024 |
70 |
89316241 |
Construction of Interlocking Khadanja work in Gram Panchayat |
500000 |
Construction of Interlocking Khadanja work in Gram Panchayat 1 |
Completion of work |
-
latitude : 25.4357431,25.4357431
Longitude : 81.9165982,81.9165982
file name : Image_12032024093455932.png
|
2024-03-12 09:34:56.02009 |
71 |
89171537 |
Construction of Interlocking Khadanja work in Gram Panchayat |
400000 |
Construction of Interlocking Khadanja work in Gram Panchayat 1 |
Completion of work |
-
latitude : 25.4357543,25.4357543
Longitude : 81.9166091,81.9166091
file name : Image_12032024093337690.png
|
2024-03-12 09:33:37.820155 |
72 |
75007056 |
Drainage Construction |
430000 |
Drainage Construction1 |
Plinth level |
-
latitude : 25.435494901299624
Longitude : 81.91689604528274
file name : Image_12042024182201936.png
|
2024-04-12 18:22:02.01024 |
73 |
75007056 |
Drainage Construction |
430000 |
Drainage Construction1 |
Completion of work |
-
latitude : 25.4310094
Longitude : 81.9068662
file name : Image_12042024174916053.png
|
2024-04-12 17:49:16.137715 |
74 |
75007056 |
Drainage Construction |
430000 |
Drainage Construction1 |
Completion of work |
-
latitude : 25.4421081
Longitude : 81.8671114
file name : Image_12042024173509835.png
|
2024-04-12 17:35:09.924339 |
75 |
75007056 |
Drainage Construction |
430000 |
Drainage Construction1 |
Completion of work |
-
latitude : 25.4358019
Longitude : 81.9166491
file name : Image_12032024093717279.png
|
2024-03-12 09:37:17.365252 |
76 |
89316179 |
Construction of Interlocking Khadanja work in Gram Panchayat |
400000 |
Construction of Interlocking Khadanja work in Gram Panchayat 1 |
Completion of work |
-
latitude : 25.43554360109538,25.435540127304726
Longitude : 81.91700842695617,81.9170283341438
file name : Image_09062024101344936.png
|
2024-06-09 10:13:45.002665 |
77 |
89316179 |
Construction of Interlocking Khadanja work in Gram Panchayat |
400000 |
Construction of Interlocking Khadanja work in Gram Panchayat 1 |
Completion of work |
-
latitude : 25.43554558329387,25.43554558329387
Longitude : 81.91705908522621,81.91705908522621
file name : Image_09062024101238217.png
|
2024-06-09 10:12:38.283888 |
78 |
89171440 |
Construction of Interlocking Khadanja work in Gram Panchayat |
400000 |
Construction of Interlocking Khadanja work in Gram Panchayat 1 |
Completion of work |
-
latitude : 25.43554558329387,25.43554558329387
Longitude : 81.91705908522621,81.91705908522621
file name : Image_09062024101129993.png
|
2024-06-09 10:11:30.064408 |
79 |
107094273 |
Any other operation and maintenance needs related to solid waste management |
500000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 25.1271101
Longitude : 82.3946006
file name : Image_03102024150449023.png
|
2024-10-03 15:04:49.120854 |
80 |
107094273 |
Any other operation and maintenance needs related to solid waste management |
500000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 25.1921906
Longitude : 82.3222549
file name : Image_03102024105740107.png
|
2024-10-03 10:57:40.197429 |
81 |
107094273 |
Any other operation and maintenance needs related to solid waste management |
500000 |
Any other operation and maintenance needs related to solid waste management1 |
Plinth level |
-
latitude : 25.1921896
Longitude : 82.3222818
file name : Image_03102024104304977.png
|
2024-10-03 10:43:05.056488 |
82 |
107094273 |
Any other operation and maintenance needs related to solid waste management |
500000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 25.1921967
Longitude : 82.3222515
file name : Image_01102024123235972.png
|
2024-10-01 12:32:36.054245 |
83 |
107094273 |
Any other operation and maintenance needs related to solid waste management |
500000 |
Any other operation and maintenance needs related to solid waste management1 |
Completion of work |
-
latitude : 25.1921706
Longitude : 82.3222228
file name : Image_01102024121555130.png
|
2024-10-01 12:15:55.21141 |
84 |
107093868 |
Drainage Construction |
500000 |
Drainage Construction1 |
Plinth level |
-
latitude : 25.1271121
Longitude : 82.3946014
file name : Image_03102024151904618.png
|
2024-10-03 15:19:04.680398 |
85 |
107093868 |
Drainage Construction |
500000 |
Drainage Construction1 |
Plinth level |
-
latitude : 25.1921923
Longitude : 82.3222769
file name : Image_03102024114322648.png
|
2024-10-03 11:43:22.726793 |
86 |
107093868 |
Drainage Construction |
500000 |
Drainage Construction1 |
Completion of work |
-
latitude : 25.1921959
Longitude : 82.3222434
file name : Image_01102024123322836.png
|
2024-10-01 12:33:22.927662 |
87 |
107093868 |
Drainage Construction |
500000 |
Drainage Construction1 |
Completion of work |
-
latitude : 25.1921953
Longitude : 82.3222501
file name : Image_01102024122117947.png
|
2024-10-01 12:21:18.036039 |
88 |
104684565 |
Construction of new Piped Water Supply schemes |
500000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 25.1271351
Longitude : 82.3946434
file name : Image_03102024154934909.png
|
2024-10-03 15:49:34.979892 |
89 |
104684565 |
Construction of new Piped Water Supply schemes |
500000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 25.127185
Longitude : 82.39470000000001
file name : Image_03102024153320903.png
|
2024-10-03 15:33:20.980735 |
90 |
104684565 |
Construction of new Piped Water Supply schemes |
500000 |
Construction of new Piped Water Supply schemes1 |
Completion of work |
-
latitude : 25.1270622
Longitude : 82.3945867
file name : Image_03102024153056192.png
|
2024-10-03 15:30:56.274277 |
91 |
107093842 |
Drainage Construction |
500000 |
Drainage Construction1 |
Plinth level |
-
latitude : 25.1270535
Longitude : 82.3945826
file name : Image_03102024151400194.png
|
2024-10-03 15:14:00.27967 |
92 |
107093842 |
Drainage Construction |
500000 |
Drainage Construction1 |
Completion of work |
-
latitude : 25.1921952
Longitude : 82.3222502
file name : Image_01102024125941059.png
|
2024-10-01 12:59:41.157867 |
93 |
107093842 |
Drainage Construction |
500000 |
Drainage Construction1 |
Completion of work |
-
latitude : 25.1921957
Longitude : 82.3222514
file name : Image_01102024125224479.png
|
2024-10-01 12:52:24.573747 |
94 |
104695005 |
Construction of Retaining Walls/ Fencing Work |
500000 |
Construction of Retaining Walls/ Fencing Work1 |
Completion of work |
-
latitude : 25.435601776479093
Longitude : 81.91697660663286
file name : Image_12072024190311094.png
|
2024-07-12 19:03:11.185378 |
95 |
107093986 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
500000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Plinth level |
-
latitude : 25.1271358
Longitude : 82.3946458
file name : Image_03102024154239348.png
|
2024-10-03 15:42:39.438162 |
96 |
107093986 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
500000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 25.1921963
Longitude : 82.322251
file name : Image_01102024121708143.png
|
2024-10-01 12:17:08.233759 |
97 |
107093986 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets |
500000 |
Construction/Maintenance/Upgradation of Building Hall, Community Centre, Boundary wall, Flooring, doors, window, fixtures etc of Community Assets1 |
Completion of work |
-
latitude : 25.1921957
Longitude : 82.3222451
file name : Image_01102024120654735.png
|
2024-10-01 12:06:54.842656 |
98 |
104684565 |
Construction of new Piped Water Supply schemes |
500000 |
Construction of new Piped Water Supply schemes2 |
Completion of work |
-
latitude : 25.1271186
Longitude : 82.3946016
file name : Image_03102024154021565.png
|
2024-10-03 15:40:21.640741 |
99 |
107093723 |
Construction of roads |
500000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.426381666666664,25.426444999999998
Longitude : 81.91524,81.91522833333333
file name : Image_25082024133324171.png
|
2024-08-25 13:33:24.244641 |
100 |
107093723 |
Construction of roads |
500000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.4265105,25.4264755
Longitude : 81.9145162,81.9145303
file name : Image_24082024200158099.png
|
2024-08-24 20:01:58.165133 |
101 |
107093723 |
Construction of roads |
500000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.4263367,25.4264345
Longitude : 81.9144457,81.9145451
file name : Image_24082024195319066.png
|
2024-08-24 19:53:19.136966 |
102 |
107093745 |
Construction of roads |
500000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.150261666666665,25.15013333333333
Longitude : 82.34352833333332,82.343235
file name : Image_13082024202019732.png
|
2024-08-13 20:20:19.807629 |
103 |
107093745 |
Construction of roads |
500000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.358754999999995,25.358754999999995
Longitude : 82.28171499999999,82.28171499999999
file name : Image_27072024165041553.png
|
2024-07-27 16:50:41.632173 |
104 |
107093745 |
Construction of roads |
500000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.358736666666665,25.358736666666665
Longitude : 82.28169000000001,82.28169000000001
file name : Image_27072024164726094.png
|
2024-07-27 16:47:26.173477 |
105 |
107093601 |
Construction of roads |
500000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.192308333333337,25.1921966
Longitude : 82.32222666666667,82.3222285
file name : Image_22102024102045022.png
|
2024-10-22 10:20:45.099478 |
106 |
107093601 |
Construction of roads |
500000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.1921972,25.1921969
Longitude : 82.3222407,82.3222301
file name : Image_22102024101632913.png
|
2024-10-22 10:16:32.986187 |
107 |
107093655 |
Construction of roads |
500000 |
Construction of roads1 |
Roof laid |
-
latitude : 25.1921641,25.192386666666668
Longitude : 82.3222241,82.32236999999999
file name : Image_27112024160742889.png
|
2024-11-27 16:07:42.965955 |
108 |
107093655 |
Construction of roads |
500000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.1922093,25.1922093
Longitude : 82.3222432,82.3222432
file name : Image_27112024160343502.png
|
2024-11-27 16:03:43.57915 |
109 |
107093655 |
Construction of roads |
500000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.1922074,25.1922543
Longitude : 82.3222456,82.3224873
file name : Image_27112024155606121.png
|
2024-11-27 15:56:06.200088 |
110 |
107093634 |
Construction of roads |
500000 |
Construction of roads1 |
Plinth level |
-
latitude : 25.1546966,25.1561665
Longitude : 82.5027012,82.5013038
file name : Image_09122024190134945.png
|
2024-12-09 19:01:35.017465 |
111 |
107093634 |
Construction of roads |
500000 |
Construction of roads1 |
Completion of work |
-
latitude : 25.1561965,25.1561964
Longitude : 82.5012609,82.5012649
file name : Image_09122024185657122.png
|
2024-12-09 18:56:57.187954 |